Select a service
- All
- 3D Building Information Modelling
- Adding Stories
- Assessment, Strengthening and Bridge Inspection
- Basement Construction Method Statements (CMS) for Planning
- Basement Impact Assessments (BIA) for Planning
- Basements and Deep Excavations
- Civil Engineering and Retaining Walls
- Concrete Design
- Domestic Extensions
- Exposed Structure
- Facade Retention
- Feasibility Studies
- Feature Staircases
- Foundation Design
- Listed & Historic Building Consent
- Loft Conversions
- Modular Construction
- New Build
- Party Wall Engineering Review Services
- Refurbishment
- Reinforcement Detailing
- Removal of Load Bearing Walls & Licence to Alter
- Steel Connection Design
- Steel Design
- Structural Inspections and Reports
- Temporary Works Design
- Timber Structures
- Underground Drainage
- Underpinning
Basement Construction Method Statements (CMS) for Planning
Basement impact assessment, BIA, basement, planning
Basement extensions are an increasing popular way to add additional space however many London boroughs are making it increasing difficult to achieve planning permission.
Planning applications often require detailed proposals for how the basement will be constructed safely, taking into account the specifics of the local ground conditions and proposed works. These reports are commonly referred to as Basement Construction Method Statements (CMS) or Basement Impact Assessments (BIA) and must be prepared by an experienced Chartered Engineer.
SD Structures have helped secure planning for large and small basements across London, including under listed buildings.